From the Youtube description:
Published on Jun 5, 2015
Every
year, local communities on either side of the Apurimac River Canyon use
traditional Inka engineering techniques to rebuild the Q'eswachaka
Bridge. The entire bridge is built in only three days. The bridge has
been rebuilt in this same location continually since the time of the
Inka.
All I can say is WOW!
ReplyDelete